
Add to Cart
4t High efficiency environment protection automatic electric heating thermal oil boiler
Electric thermal oil furnace only withstandther pressure of the pump, there is no danger of explosion of the thermal oil heating system, it is safer;
The electric heating heat transfer oil furnace is used to transmit heat indirectly by using thermal oil as the heat carrier. Because the electric heating heating oil furnace has uniform heating, temperature control is accurate, can produce high temperature under low steam pressure, heat transfer effect is good, energy saving, transportation and easy operation and so on, in recent years has been widely used in various occasions.
Parameters
DRYL-2800
NO; | Name | Unit | Number | Description |
1 | Rated thermal power | KW | 2800 | |
2 | Rated working power | Mpa | 1.0 | |
3 | Rated inlet/outlet ℃ | ℃ | 310/290 | |
4 | Design efficiency | % | 92.45(Oil) 92.13(Gas) | |
5 | Boiler heat efficiency | % | More than 98% | Be added economizer |
6 | Design fuels | / | Light oil,Gas | |
7 | Fuels LHV | MJ/kg | 42.917(Oil) | |
MJ/Nm3 | 35.438(Gas) | |||
8 | Consumption of fuels | kg/h | 70.77(Oil) | |
Nm³/h | 86.53(Gas) | Be added economizer | ||
9 | Radiation heating area | m² | 7.199 | |
Convection heating area | m² | 28.71 | ||
GGH heating area | m² | 10.965 | ||
10 | Fume temperature | ℃ | 136.68(Oil) | |
℃ | 137.02 (Gas) | |||
11 | Fume temperature | ℃ | 60-80 | Be added economizer |
12 | Excess air coefficient | / | 1.15 | |
13 | Volume | m3 | 0.46 | |
14 | Bulk weight | kg | 4250 | |
15 | Bulk size | mm | 6256×2800×2700 | |
16 | Chimney | mm | Φ325×10000 | |
17 | Combustion model | / | Micro positive pressure | Chamber combustion |
18 | Boiler structure feature | Horizontal-type chamber combustion | ||
19 | Control way | Full automation/Manual | ||
20 | Ignition way | High-tension/Electrode |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.