
Add to Cart
High Efficiency Three-Pass Structure Durable Fully Automatic Oil Fired Steam Boiler
The first return pipe is arranged in the center of the furnace bile and the return chamber connection composition, the return chamber is connected to one end of the furnace bile and the second return pipe, the other end of the second return pipe is connected with the parallel set of the third return pipe one end, the other end of the third return pipe is connected with the flue. The utility model can improve the heating area of the furnace, eliminate the influence of the furnace bile on boiler strength and the noise produced by the heat deformation, and adopt the three back circulation structure of flue gas, absorb the heat in the flue gas deeply, and achieve the effect of energy saving and environmental protection.
Product parameter
WNS2-1.25-YQ
NO; | Name | Unit | Number | Description |
1 | Rated evaporation | t/h | 2 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated outlet ℃ | ℃ | 193 | |
4 | Design efficiency | % | 92.6(Oil) | |
5 | Boiler heat efficiency | % | More than 98% | |
6 | Design fuels | / | Light oil,Gas | |
7 | Fuels LHV | MJ/kg | 42.917(Oil) | |
MJ/Nm3 | 35.438(Gas) | |||
8 | Consumption of fuels | kg/h | 137.9(Oil) | |
Nm³/h | 167.325(Gas) | |||
9 | Radiation heating area | m² | 8.527 | |
Convection heating area | m² | 41.838 | ||
GGH heating area | m² | 23.195 | ||
10 | Fume temperature | ℃ | 137.863(Oil) | |
℃ | 134.28 (Gas) | |||
11 | Fume temperature | ℃ | 60-80 | |
12 | Excess air coefficient | / | 1.15 | |
13 | Volume | m3 | 5 | |
14 | Bulk weight | kg | 9700 | |
15 | Bulk size | mm | 4531×2150×2544 | |
16 | Chimney | mm | Φ500×10000 | |
17 | Total power consumption | KW | Oil:13,Gas:11 | |
18 | Combustion model | / | Micro positive pressure | Chamber combustion |
19 | Boiler structure feature(Three-pass structure) | Horizontal-type chamber combustion | ||
20 | Control way | Full automation/Manual | ||
21 | Ignition way | High-tension/Electrode |
WNS4-1.25-YQ
NO; | Name | Unit | Number | Description |
1 | Rated evaporation | t/h | 4 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated outlet ℃ | ℃ | 194 | |
4 | Design efficiency | % | 92.06(Oil) | |
5 | Boiler heat efficiency | % | More than 98% | |
6 | Design fuels | / | Light oil,Gas | |
7 | Fuels LHV | MJ/kg | 42.917(Oil) | |
MJ/Nm3 | 35.438(Gas) | |||
8 | Consumption of fuels | kg/h | 275.8(Oil) | |
Nm³/h | 334.65(Gas) | |||
9 | Radiation heating area | m² | 10.955 | |
Convection heating area | m² | 83.887 | ||
GGH heating area | m² | 21.488 | ||
10 | Fume temperature | ℃ | 140.6(Oil) | |
℃ | 137.75 (Gas) | |||
11 | Fume temperature | ℃ | 60-80 | |
12 | Excess air coefficient | / | 1.15 | |
13 | Volume | m3 | 5 | |
14 | Bulk weight | kg | 8000 | |
15 | Bulk size | mm | 4300×1900×2400 | |
16 | Chimney | mm | Φ400×10000 | |
17 | Combustion model | / | Micro positive pressure | Chamber combustion |
18 | Boiler structure feature(Three-pass structure) | Horizontal-type chamber combustion | ||
19 | Control way | Full automation/Manual | ||
20 | Ignition way | High-tension/Electrode |
Our service
Pre-sale service:
We help customer choose the best boiler model according to different requirements of various industry. Before delivery we will provide foundation drawing, layout drawing, boiler room layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.